Arrowhead Stadium Renovation – Kansas City, MO

This project involved the structural design of an ultra-modern sports facility. Scope included the evaluation of the existing structure and the subsequent design of the new additions. These additions involved vertical and horizontal dimension that totally transformed the existing structure into an ultra-modern sports complex. With this design/modification, the seating capacity of the stadium was increased by 50%. This half a million square feet of construction include new construction and/or renovation, demolition repairs and alterations to existing facilities. There are new concessions, modern ADA compliant facilities for the disabled, cabaret, suite, concessions and premium seating for the patrons.

There is an 80% increase in the restrooms, 50% increase in retail and concession facilities, as well as renovations to locker rooms and support areas.

Value engineering was performed to identify the optimal design. Geotechnical studies and investigation were done.

Premier Engineering staffs were among the design team responsible for this highly visible public project.  As a sub consultant to the Prime Consultant, Premier Engineering staff participated in all aspects of the structural engineering design.

The extent of Participation of Premier Engineering Consultants, LLC.:   100%  Design

Construction cost:  $400 million

Size: 500,000 sf of new construction

Role: Sub-Consultant for Structural Engineering

Type:

Athletics

Client:

Jackson County / Kansas City, Missouri