Role: Project Administration, Surveys, Final Design

Kansas City Water Main Replacement Projects

Water Main Replacement Projects

Existing Infrastructure at WMR Site

Existing Infrastructure at WMR Site

The Project in general consists of replacing certain break-prone or obsolete water mains and appurtenances and providing other distribution system improvements within the project limits, generally defined as N Oak Trfy to N Tracy, NE 96th Ter to NE Cookingham Dr. The specific mains to be replaced and other distribution system improvements within the project limits consist of the following:

  • 8″ Main between NE 115th St and NE 116th St along N Oak Trfy
  • 8″ Main between N Oak Trfy and N 108th Ter along NE Karapat Dr
  • 8″ Main between 96th St and 98th Ter along 97th S

Our Scope of Services for this Project includes project administration, preliminary field and record investigations, property surveys, pipeline route survey, preliminary and final design, and preparation of construction drawings for bidding. This project was completed in 2016.

Our Drawings showed the plans and details for the proposed improvements with pipeline The Project in general consists of replacing certain break-prone or obsolete water mains and appurtenances and providing other distribution system improvements within the project limits, generally defined as N Chaumiere to N Cleveland, NE Russell Rd to NE 43rd Street. The specific mains to be replaced and other distribution system improvements within the project limits consist of the following:

  • 6″ Main along N Chaumiere between NE Russell and E43rd.
  • 6″ Main along 43rd Street between N Cleveland N Askew Ave.
  • 6″ Main along N Monroe Ave between NE Russell and NE41st Street

Our Scope of Services for this Project includes project administration, preliminary field and record investigations, property surveys, pipeline route survey, preliminary and final design, and preparation of construction drawings for bidding. Our Drawings showed the plans and details for the proposed improvements with pipeline profiles. This project is on-going and scheduled to be completed in September 2018

Role: Project Administration, Surveys, Final Design

Type:

Municipal

Client:

Kansas City, MO